Construction Cost Calculator
Get a construction cost estimate for your house. Rates are editable — the result is an estimate, not a quotation.
Covered area (sq ft)
Grey structure rate (PKR / sq ft)
Finishing rate (PKR / sq ft)
Grey structure: PKR 5,600,000
Finishing: PKR 4,400,000
Estimated total: PKR 10,000,000
Estimate only. Real cost depends on material, labour and the area. Get a quotation from a contractor before you start.
